Foundation hold-downs are the final link in the continuous load path that prevents a building from lifting off its foundation during a hurricane. In Broward County's 170-180 MPH wind environment, net uplift forces at corner posts can exceed 10,000 pounds — enough to extract an improperly anchored stud from a concrete slab in seconds. This guide compares the four primary hold-down systems used in Broward County construction, analyzing each for uplift capacity, cost efficiency, installation complexity, inspection requirements, and retrofit suitability across residential and light commercial applications.
Radar chart analysis of four primary hold-down systems across five critical performance dimensions for Broward County wind load applications
Detailed analysis of each hold-down system's strengths, limitations, and ideal applications in Broward County's wind environment
The Simpson HDU is the most widely specified hold-down in Broward County residential construction. The bracket mounts to the face of a stud or post using Strong-Drive SD structural screws (eliminating the need to drill through the stud for bolts), while a single anchor bolt connects to the concrete foundation. The HDU8 provides 7,720 pounds of allowable uplift in Southern Pine — sufficient for most single-story corner posts at 170 MPH. For higher loads, the HDU11 reaches 10,530 pounds and the HDU14 tops out at 14,930 pounds. The primary advantage is simplicity: published allowable loads from the manufacturer's ICC-ES evaluation report (ESR-2100) streamline engineering, plan review, and field inspection.
Cast-in-place anchor bolts (J-bolts or L-bolts) embedded in the concrete foundation during the pour provide the highest pullout capacity per dollar but require precise placement before the concrete sets. For hold-down applications, a 3/4-inch F1554 Grade 55 J-bolt with 12-inch embedment develops approximately 10,000 pounds of pullout capacity in 3,000 psi concrete. The challenge is positioning accuracy: if the bolt shifts during the concrete pour and ends up more than 1/4 inch off the planned location, the hold-down bracket may not fit, requiring expensive corrective measures (core drilling, epoxy dowels, or bracket modifications). For Broward County HVHZ projects, cast-in-place bolts are the default for new construction foundations.
Post-installed epoxy anchors are the go-to solution for retrofit and renovation projects where hold-downs must be added to existing foundations. A hole is drilled into the cured concrete, cleaned with a brush and compressed air, and filled with two-component epoxy adhesive before inserting a threaded rod. After the epoxy cures (typically 4-24 hours depending on temperature), the anchor develops pullout capacity comparable to cast-in-place bolts. The critical variable is installation quality: FBC Section 1705.1.1 requires special inspection for all post-installed anchors in the HVHZ, including verification of hole diameter, depth, cleanliness, epoxy volume, and rod insertion method. Improperly cleaned holes can reduce capacity by 50% or more.
Continuous rod systems like Simpson Strong-Rod ATS run a threaded steel rod from the foundation to the roof, creating a single unbroken tension element that bypasses all intermediate floor connections. This eliminates the cumulative deflection problem of stacked hold-downs, where wood shrinkage, fastener slip, and bearing deformation at each floor level compound to create 1/4 to 1/2 inch of total system slack. A 7/8-inch threaded rod develops approximately 20,000 pounds of tension capacity — more than sufficient for 3-4 story wood-frame buildings in Broward's HVHZ. The system includes take-up devices at each floor that compensate for wood shrinkage over time, maintaining preload on the rod throughout the building's life.
Detailed comparison table for engineering, cost, and construction planning across all four hold-down system types
| Feature | Simpson HDU | Cast-in-Place | Post-Installed | Continuous Rod |
|---|---|---|---|---|
| Max uplift capacity | 14,930 lbs | 15,000+ lbs | 7,500 lbs | 25,000 lbs |
| Hardware cost per location | $45-120 | $8-15 | $25-50 | $150-300 |
| Installation labor | 15-30 min | 10-20 min (during pour) | 45-90 min (drill + cure) | 2-4 hours (multi-story) |
| Special inspection required | No (per ESR) | Concrete pour inspection | Yes (FBC 1705.1.1) | No (per ESR) |
| Retrofit suitability | Moderate (needs bolt) | Not applicable | Excellent | Poor (needs open walls) |
| Multi-story stacking | Yes (with posts) | Foundation only | Foundation only | Integrated (no stacking) |
| Wood shrinkage compensation | None (gap develops) | None | None | Built-in take-up device |
| ICC-ES evaluation report | ESR-2100 | Per ACI 318 | Product-specific ESR | ESR-2320 |
| Best application | 1-2 story residential | New construction | Retrofits & additions | 3-4 story wood-frame |
The continuous load path is not a single connection but a chain of connections, each designed to transfer the cumulative wind uplift force from the roof sheathing down through every structural element to the foundation. In Broward County's 180 MPH HVHZ, every link in this chain must be engineered and inspected because the loads exceed what conventional prescriptive construction methods can resist.
The chain begins at the roof deck, where sheathing nails or screws must resist the component and cladding uplift pressure (typically 40-90 psf depending on zone). Roof trusses or rafters connect to the top plate through hurricane straps rated for the tributary uplift (1,500-4,000 pounds per connection for typical truss spacing). The top plate transfers load to the wall studs through the nailed connection, then the studs carry the load to the bottom plate.
At the bottom plate, the load transfers to the foundation through two parallel systems: the distributed anchor bolt pattern (typically 5/8-inch bolts at 4-6 feet on center) handles the general uplift across the wall length, while hold-down hardware at the ends of shear walls and at corner posts handles the concentrated uplift forces that exceed the distributed anchor bolt capacity. If the hold-down is undersized, missing, or improperly installed, the concentrated uplift at that location has no path into the foundation, and the stud or post pulls free from the concrete.
Thousands of existing homes and commercial buildings in Broward County were constructed before the 2001 Florida Building Code required continuous load path engineering. These pre-2001 structures rely on prescriptive connections — toe-nails, minimal anchor bolts, and no hold-down hardware — that are inadequate for 170-180 MPH wind speeds. Retrofitting hold-downs into these existing buildings is one of the most cost-effective hurricane hardening measures available, but it requires careful engineering to account for the limitations of existing foundations and framing.
The primary challenge in retrofit work is the existing foundation. Older Broward County homes often have 8-inch stem wall foundations with minimal reinforcement and no hold-down anchor bolts. Post-installed epoxy anchors are the standard solution, but the shallow foundation depth (sometimes only 8-10 inches above the footing) limits the available embedment length and therefore the anchor capacity. An engineer must calculate the concrete breakout capacity considering the actual edge distance, spacing, and concrete strength, which often requires core drilling and testing to verify.
Despite these challenges, retrofit hold-down installation is strongly encouraged by insurance carriers and may qualify for premium discounts under Florida's My Safe Florida Home program. A complete load path retrofit for a typical single-story Broward County residence involves 8-12 hold-down locations and costs $4,000-8,000 including engineering, hardware, installation, and inspection.
The regulatory framework governing hold-down design in Broward County involves multiple interconnected codes, testing standards, and material specifications that structural engineers must navigate to produce compliant and constructible designs
Hold-down engineering in Broward County sits at the intersection of wind load analysis (ASCE 7-22), wood connection design (NDS), concrete anchorage (ACI 318), and manufactured connector evaluation (ICC-ES criteria). The structural engineer must synthesize requirements from all four of these standards to produce a complete hold-down design that passes both plan review and field inspection. Understanding how these standards interact is essential for efficient engineering and successful permitting in Broward County's rigorous regulatory environment.
The Florida Building Code 8th Edition (2023) references multiple standards that govern hold-down design in Broward County. The primary load calculation follows ASCE 7-22 Chapters 27-28 for MWFRS wind loads, which determine the gross uplift at each hold-down location. The net uplift is calculated using the load combination 0.9D + 1.0W (LRFD) or 0.6D + 0.6W (ASD), where D is the tributary dead load resisting uplift and W is the wind uplift force.
For wood-frame connections, the National Design Specification (NDS) for Wood Construction governs the capacity of fasteners, bolts, and engineered connectors. Simpson Strong-Tie and other manufacturers publish allowable loads based on NDS testing protocols, with values specific to each wood species (Southern Pine is standard in Broward County). The allowable loads in the manufacturer catalogs already include the NDS load duration factor for wind loading (Cd = 1.6 for ASD), so engineers should not apply an additional duration factor when comparing hold-down capacity to calculated wind loads.
For the concrete foundation connection, ACI 318-19 Appendix D (now Chapter 17 in ACI 318-19) governs the anchor bolt design, including calculations for steel strength of the anchor, concrete breakout in tension, pullout strength, concrete side-face blowout, and concrete pryout in shear. Each failure mode must be checked independently, and the controlling (lowest) capacity determines the anchor bolt's design strength. For post-installed anchors, the capacity is determined from the manufacturer's ICC-ES evaluation report, which provides tested values for specific anchor types, diameters, embedment depths, and concrete strengths.
Post-hurricane forensic investigation findings reveal recurring hold-down failures in Broward County buildings
The most common hold-down failure mode in Broward County is anchor bolt pullout from the concrete foundation. This occurs when the concrete breakout cone capacity is exceeded, often because the original design did not account for the reduced edge distance at the foundation perimeter. A 5/8-inch anchor bolt with only 3 inches of edge distance in 2,500 psi concrete develops approximately 40% less pullout capacity than the same bolt with 6 inches of edge distance. Older Broward County foundations (pre-2001) frequently have anchor bolts placed too close to the slab edge, where the breakout cone intersects the foundation face and reduces capacity below the required uplift resistance.
Hold-down brackets connect to wood studs or posts using structural screws or bolts that must develop the full bracket capacity in the wood member. When the fasteners are installed too close to the end of the stud or too close together, the wood splits along the grain, reducing the withdrawal and shear capacity of the fastener group. Southern Pine (the dominant framing lumber in Broward County) is particularly susceptible to splitting when fasteners are placed within 3 inches of the member end. The Simpson HDU installation instructions specify minimum edge and end distances for all fasteners, but field crews occasionally violate these requirements when the stud or post is narrower than expected or when the hold-down must be offset to clear a plumbing or electrical conflict.
Perhaps the simplest and most preventable failure mode is a missing or inadequately tightened nut on the hold-down anchor bolt. Without a nut and washer, the hold-down bracket cannot transfer any tension from the wood stud to the anchor bolt. During post-hurricane inspections following Wilma (2005) and Irma (2017), investigators found instances of hold-down brackets installed on anchor bolts with no nut, with finger-tight nuts, or with standard nuts instead of the specified heavy hex nuts. The FBC requires the building inspector to verify the presence and tightness of all hold-down nuts during the framing inspection, but missed installations can occur when hold-downs are added after the initial framing inspection has already passed.
A hold-down is only effective if the stud or post it is attached to extends continuously from the hold-down bracket up to the top plate connection. If the stud is cut short (for a window header, for example) and the hold-down force must transfer through a nailed or screwed connection to another member, the capacity of that intermediate connection often governs the system capacity. Broward County building inspectors verify stud continuity during the framing inspection, checking that the hold-down stud runs full height from the bottom plate to the top plate without interruption. When stud continuity cannot be maintained due to openings, the engineer must design a load path that transfers the hold-down force through steel strapping, blocking, or engineered header connections that have documented capacity for the full uplift load.
The gap between designed capacity and installed capacity is one of the most critical issues in Broward County wind-resistant construction. A hold-down system that is perfectly engineered on paper can deliver zero uplift resistance if the field installation does not match the design documents. This gap is not theoretical — post-hurricane damage assessments consistently reveal that installation deficiencies, not engineering errors, cause the majority of hold-down failures in South Florida buildings.
Even the best-engineered hold-down system fails if the field installation does not match the design intent. Broward County building inspectors report that hold-down deficiencies are among the top five most common framing inspection correction items for residential construction. The most frequent errors include installing the hold-down bracket upside down (reducing its capacity by 30-50%), using the wrong fastener type (drywall screws instead of structural screws), installing fewer fasteners than specified, and positioning the bracket on the wrong side of the stud (blocking drywall installation or conflicting with mechanical/electrical routing). Understanding these common errors helps contractors avoid costly re-inspections and ensures that the installed capacity matches the engineered design.
The financial impact of hold-down installation errors extends beyond the immediate repair cost. A failed framing inspection in Broward County triggers a re-inspection fee ($75-150 per visit), delays the construction schedule by 2-5 days while corrections are made, and may require the structural engineer to review and approve field modifications at additional cost ($200-500 per engineering review). For a typical residential project with 8-12 hold-down locations, a single round of corrections can add $1,500-3,000 to the project cost and 1-2 weeks to the schedule. Prevention through proper training and on-site quality control is far less expensive than correction after the fact.
General contractors in Broward County who specialize in hurricane-resistant construction have developed internal quality control procedures that go beyond the minimum code requirements. These procedures include pre-framing layout meetings where the hold-down locations are marked on the slab with the specific hardware model number, mid-framing quality checks before requesting the official inspection, and photographic documentation of every hold-down installation for the project file. These practices represent industry best practice in South Florida's demanding wind load environment and consistently produce first-pass inspection approval rates above 90%.
Training and communication are the primary solutions to reducing installation errors. The framing contractor should receive a hold-down schedule from the structural engineer that clearly identifies each hold-down location on the floor plan, the hardware model required, the number and type of fasteners, the anchor bolt diameter and projection, and any special installation requirements. This schedule should be posted at the job site during framing and available to both the framing crew and the building inspector.
Many Broward County structural engineers now include hold-down installation photographs in their plan sets, showing the correct orientation, fastener pattern, and clearances for each hold-down type used on the project. Simpson Strong-Tie provides installation instruction sheets with each hold-down bracket that include visual diagrams of the correct installation. Some engineers also require the framing contractor to submit photographs of each installed hold-down before requesting the framing inspection, creating a documentation trail that catches errors before the inspector arrives on site. This proactive approach has been shown to reduce framing inspection failure rates by 40-60% on Broward County residential projects, saving both time and money for all parties involved in the construction process.
How different foundation systems in Broward County affect hold-down capacity, installation method, and inspection requirements
The monolithic slab-on-grade foundation combines the floor slab and the perimeter footing in a single concrete pour, creating a thickened edge (typically 12-18 inches deep) around the building perimeter. Hold-down anchor bolts are set in the thickened edge before the concrete pour, projecting above the slab surface at each engineered hold-down location. The limited depth of the thickened edge restricts the anchor bolt embedment to 8-12 inches, which can limit the concrete breakout capacity for higher uplift loads. For net uplift forces exceeding 8,000 pounds, the engineer may need to specify a deeper local thickening (a grade beam) at the hold-down locations to provide adequate embedment depth and concrete breakout area.
Stem wall foundations use a separate concrete wall (stem) rising from a continuous spread footing to support the floor slab. The stem wall is typically 8-12 inches wide and 16-24 inches tall, providing a deeper and more concentrated mass of concrete for hold-down anchor bolt embedment. The continuous footing below the stem adds dead weight that directly resists uplift forces at the hold-down location. For Broward County's 170-180 MPH wind loads, the stem wall foundation is preferred over monolithic slabs for buildings where the net uplift exceeds 6,000 pounds per hold-down because the deeper stem provides more concrete breakout capacity and the footing weight contributes to the gravity resistance against uplift.
Buildings on pile or pier foundations (common in eastern Broward County's coastal zone and areas with expansive soils) present unique hold-down challenges because the hold-down anchor bolt must ultimately transfer its tension to the pile through a pile cap or grade beam connection. The pile cap is a reinforced concrete element that sits on top of the pile and supports the building's structural loads. The hold-down anchor bolt is embedded in the pile cap, and the pile cap-to-pile connection must be designed to resist the net uplift tension. For driven piles, this requires the pile to be embedded a minimum distance into the pile cap (typically 6-12 inches) with reinforcing dowels that transfer the tension from the cap concrete to the pile. For drilled piers, the continuous reinforcement from the pier shaft into the cap provides the tension connection.
Raised floor foundations (stem wall with open crawl space below the first-floor framing) are less common in Broward County but exist in some elevated coastal properties built to reduce flood damage. In this configuration, the hold-down at the first-floor level connects the wall stud to the mudsill, and the mudsill connects to the foundation wall through anchor bolts in the stem wall top. The crawl space allows visual inspection of the hold-down hardware from below, which is an advantage for maintenance and post-storm evaluation. However, the exposed hardware in the humid crawl space environment is susceptible to accelerated corrosion, making stainless steel or heavily galvanized hardware essential for long-term reliability.
Hold-down hardware in Broward County is exposed to conditions that accelerate corrosion: high humidity, salt-laden air (within 3,000 feet of the coast), and intermittent wetting from rain and irrigation water that reaches the foundation perimeter. The Simpson HDU bracket and anchor bolts are available in multiple corrosion protection levels, and selecting the appropriate level for the site's exposure conditions is critical for long-term load path integrity.
For inland Broward County locations (more than 3,000 feet from saltwater), standard zinc galvanized coating (G90 or ZMAX) on the hold-down bracket and hot-dip galvanized anchor bolts per ASTM A153 provide adequate protection for a 50-year service life. The galvanized coating sacrificially protects the base steel, and the coating thickness is sufficient to withstand the corrosion rates typical of inland South Florida environments (approximately 0.5-1.0 mils per year).
For coastal locations within 3,000 feet of the Atlantic Ocean, the standard galvanized coating may be consumed within 15-25 years, potentially leaving the hold-down hardware unprotected for the remainder of the building's service life. In these locations, Simpson Strong-Tie offers stainless steel hold-down models (designated with an "SS" suffix) manufactured from Type 316 stainless steel that provides essentially unlimited corrosion life in marine atmospheres. The cost premium for stainless steel hold-downs is approximately 3-4 times the standard galvanized price ($150-400 per bracket versus $45-120), but the elimination of corrosion-related capacity loss over the building's life makes stainless steel the recommended choice for all coastal Broward County projects.
Anchor bolts embedded in concrete are partially protected by the alkaline environment of the concrete paste, which forms a passive oxide layer on the steel surface. However, this protection breaks down if chloride ions from salt air or salt-contaminated groundwater reach the steel surface through cracks or porous concrete. Using stainless steel anchor bolts (ASTM A193 Grade B8M for Type 316) or applying an epoxy coating to the anchor bolt eliminates this risk. The additional cost of stainless steel anchor bolts ($15-25 per bolt versus $5-10 for plain carbon steel) is negligible compared to the cost of replacing a corroded anchor bolt in an existing foundation.
Hold-downs serve a dual purpose in Broward County wood-frame construction: they resist wind uplift from the MWFRS load path, and they resist the overturning forces at the ends of shear walls that provide lateral wind resistance. When a shear wall resists lateral wind loads, the horizontal shear creates a vertical couple at the wall ends — compression on the windward end and tension on the leeward end. The tension end requires a hold-down to prevent the wall from rotating and losing its lateral load-carrying capacity.
The hold-down force from shear wall overturning is calculated as T = V x h / d, where V is the total lateral shear in the wall, h is the wall height, and d is the wall length. For a 4-foot-long, 8-foot-high shear wall with 3/8-inch structural plywood resisting 2,000 pounds of lateral shear at 180 MPH, the overturning tension is 2,000 x 8 / 4 = 4,000 pounds. This overturning tension must be combined with any direct wind uplift at the same location to determine the total hold-down requirement.
In many Broward County homes, the critical hold-down location is a corner post where both a perpendicular shear wall terminates and the MWFRS uplift load path concentrates. The combined force at this location can reach 12,000-15,000 pounds — the sum of the shear wall overturning tension (4,000-6,000 pounds) and the direct wind uplift (5,000-10,000 pounds). This combined load governs the hold-down selection and often requires the HDU11 or HDU14 rather than the HDU8 that would suffice for uplift alone. The engineer must check both load cases (uplift only and uplift plus overturning) and design for the controlling combination.
Unique engineering challenges for hold-down systems in Broward County's growing inventory of 3-4 story wood-frame residential buildings
In multi-story buildings, the wind uplift force at the foundation hold-down is the cumulative sum of the uplift contributions from each floor. The roof generates the highest per-floor contribution because it has the largest tributary area exposed to wind uplift. Each floor below adds its own tributary wall area contribution but also adds dead load that partially offsets the cumulative uplift. For a 4-story wood-frame building in Broward's HVHZ at 180 MPH, the net uplift at a corner foundation hold-down can reach 15,000-20,000 pounds — well beyond the capacity of a single Simpson HDU bracket. This is the primary reason continuous rod tie-down systems are required for 3-4 story wood-frame construction in high wind zones.
Wood-frame buildings experience cross-grain shrinkage as the lumber dries from its initial moisture content to equilibrium with the indoor environment. In a 4-story building with wood floor framing, the cumulative cross-grain shrinkage across all floor plates, sill plates, headers, and rim boards can exceed 3/4 inch over the first 2-3 years after construction. Without compensation, this shrinkage creates a gap between the hold-down bracket and the nut that prevents the connection from engaging until the building displaces 3/4 inch during a wind event — a dangerous amount of movement before the load path activates. Continuous rod systems include take-up devices (spring-loaded or ratcheting mechanisms) that automatically maintain tension on the rod as the wood shrinks, ensuring the load path is always active.
Choosing the correct hold-down system for a Broward County project depends on five primary factors: the net uplift force at each hold-down location, the building type and number of stories, whether the project is new construction or retrofit, the foundation type and condition, and the contractor's familiarity with the installation procedure. Making the wrong choice can result in plan review rejections, installation errors, inspection failures, and ultimately an inadequate load path that puts the building at risk during a hurricane.
For single-story new construction residences in Broward County, the Simpson HDU series is the default choice. The HDU8 handles the majority of corner and shear wall end post loads (up to 7,720 pounds in Southern Pine), and the installation is straightforward enough that experienced framing crews can install them without specialized training. The anchor bolt is cast in place during the foundation pour, and the bracket is screwed to the stud face during framing. Total installation time including bolt placement and bracket attachment is approximately 30 minutes per location.
For two-story residential construction, the designer must evaluate whether stacked HDU hold-downs (one at each floor level) or a continuous rod system provides the better load path. Stacked hold-downs are simpler and less expensive for low-to-moderate uplift loads (under 8,000 pounds at the foundation), but they accumulate deflection at each floor level as the wood framing shrinks and the fastener connections slip under load. For higher uplift forces (8,000-15,000 pounds at the foundation) or three-to-four-story buildings, the continuous rod system eliminates the cumulative deflection problem and provides a single unbroken tension element from foundation to roof.
Documented continuous load path connections qualify Broward County homeowners for significant wind mitigation insurance credits
Florida's Office of Insurance Regulation requires insurers to provide premium discounts for homes with documented wind mitigation features. The Uniform Mitigation Verification Inspection Form (OIR-B1-1802) includes specific questions about the roof-to-wall connection type (Question 5) and whether the building has a continuous load path from roof to foundation (additional credits). A home with documented hurricane straps, hold-down hardware, and anchor bolts verified by a licensed inspector can qualify for premium reductions of 15-45% depending on the insurer and the combination of mitigation features. In Broward County, where annual wind insurance premiums for single-family homes range from $3,000 to $12,000, these credits can represent savings of $500-5,400 per year.
The My Safe Florida Home program provides matching grants (up to $10,000 for site-built homes) for hurricane hardening improvements including hold-down installation. Eligible improvements include adding or upgrading foundation hold-downs, installing hurricane straps at roof-to-wall connections, and reinforcing gable end walls. To qualify, the homeowner must first obtain a free home inspection through the program, which identifies the specific improvements needed. The grant covers up to 50% of the improvement cost (or more for low-income households), making load path retrofit projects financially accessible for homeowners who might otherwise defer the work. In Broward County, the typical hold-down retrofit cost of $4,000-8,000 qualifies for grants of $2,000-4,000 through this program.
The soil profile across Broward County varies significantly from east to west, directly affecting foundation design for wind uplift resistance. The eastern coastal zone (roughly east of US-1) is characterized by Miami Oolite limestone that begins 2-6 feet below grade, providing excellent bearing capacity and relatively high pullout resistance for anchor bolts and drilled piers. Foundations in this zone can be shorter because they bear on rock rather than relying solely on soil friction.
The central zone (between US-1 and the Turnpike) transitions from limestone to dense sand and coquina shell layers. This mixed profile requires careful geotechnical investigation because the bearing capacity and pullout resistance vary significantly over short distances. A home on one side of a street may sit on limestone while the adjacent property encounters only sand to the full depth of the foundation exploration.
The western zone (west of the Turnpike, including communities like Weston, Pembroke Pines, and Miramar) is predominantly sand with varying density. Foundations in this zone rely on skin friction along the pier shaft or footing perimeter to resist uplift, which means deeper foundations are required compared to the limestone zone. A pier that provides adequate uplift resistance at 6 feet deep in limestone may need to extend 12-15 feet deep in western sand to develop the same capacity. This directly impacts the foundation cost for structures with high uplift requirements, such as two-story buildings and buildings in higher exposure categories.
Common questions about foundation hold-downs and uplift anchorage for Broward County wind load applications
Get exact net uplift forces, hold-down capacities, and anchor bolt requirements for your Broward County project. Input building geometry, wind speed, and exposure for engineer-ready MWFRS calculations.
Calculate MWFRS Loads