Closeout Progress
0/8
Docs Complete
0%
Progress
Project Closeout

Finishing Strong

Watch your documents race to the finish line. Click each lane to complete that document and see it cross the line.

FINISH
📊
As-Built Wind Calcs Pending
📄
NOA Documents Pending
🔧
Installation Certs Pending
📌
PE Sealed Docs Pending
🛡
Warranty Docs Pending
Final Inspection Pending
📖
O&M Manuals Pending
📷
Completion Photos Pending

Complete Closeout Checklist

Everything you need for a complete wind load closeout package

Calculations
As-built wind load calculations
Final design pressures
Zone diagrams
Product Data
All NOA documents
Product cut sheets
Installation instructions
Certifications
Installation certifications
PE sealed documents
Final inspection reports
Warranty
Manufacturer warranties
Installation warranty
Warranty registration forms

Document Distribution

Who gets copies of closeout documents

🏠

Building Owner

Complete package for future reference and maintenance

🏛

Building Department

Required documents per permit conditions

📑

Architect/Engineer

Project records and as-built documentation

📁

Your Files

Retain for minimum 10 years

Common Questions

What closeout documents are needed for Miami-Dade HVHZ projects? +

Key closeout documents include: As-built wind load calculations, product data with valid NOAs, installation certifications, PE sealed documents if required, warranty documentation, and final inspection reports.

How long should I retain wind load closeout documents? +

Retain documents for the life of the building plus any warranty periods. At minimum, keep for 10 years. Digital copies should be stored in multiple locations. These documents may be needed for future renovations or insurance claims.

Who needs copies of the wind load closeout documents? +

Provide copies to: the building owner, building department (as required), architect/engineer of record, and your company files. The owner should receive a complete package for future reference.

What format should closeout documents be in? +

Provide both digital (PDF) and printed copies unless otherwise specified. Organize in clearly labeled sections. Digital files should be searchable PDFs when possible. Create an index or table of contents for easy reference.